Short term electrical load forecasting using holt-winters method جىقعات األح ال انكهشبائ ة نه ذي انقص ش باسحخذاو طش قة هىنث و حش

Similar documents
Short Term Load Forecasting Based Artificial Neural Network

Short-Term Electrical Load Forecasting for Iraqi Power System based on Multiple Linear Regression Method

USE OF FUZZY LOGIC TO INVESTIGATE WEATHER PARAMETER IMPACT ON ELECTRICAL LOAD BASED ON SHORT TERM FORECASTING

Product and Inventory Management (35E00300) Forecasting Models Trend analysis

Horizontal Alignment Design:

Study of the Performance of Batch Reactive Distillation Column

Forecasting Using Time Series Models

A Comparison of the Forecast Performance of. Double Seasonal ARIMA and Double Seasonal. ARFIMA Models of Electricity Load Demand

LOAD FORECASTING APPLICATIONS for THE ENERGY SECTOR

Electric Load Forecasting Using Wavelet Transform and Extreme Learning Machine

Artificial Neural Network for Energy Demand Forecast

Fuzzy Logic Approach for Short Term Electrical Load Forecasting

Noon Sakinah and Tanween. Chapter 5

INTRODUCTION TO FORECASTING (PART 2) AMAT 167

Operations Report. Tag B. Short, Director South Region Operations. Entergy Regional State Committee (ERSC) February 14, 2018

Multivariate Regression Model Results

Frequency Forecasting using Time Series ARIMA model

Automatic forecasting with a modified exponential smoothing state space framework

Chapter 7 Forecasting Demand

FAST! Tajweed Intensive Workshop! Rules of Noon Sakinah & Tanween Part 1

Normalization of Peak Demand for an Electric Utility using PROC MODEL

Automatic Forecasting

BUSI 460 Suggested Answers to Selected Review and Discussion Questions Lesson 7

Wind power and management of the electric system. EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015

Lecture Prepared By: Mohammad Kamrul Arefin Lecturer, School of Business, North South University

SOLUTION OF SECOND ORDER PARTIAL DIFFERENTIAL EQUATIONS WITH VARIABLE COEFFICIENTS

3. If a forecast is too high when compared to an actual outcome, will that forecast error be positive or negative?

Minorities and their Impact on the Stability of the. (Iraq s Kurds as an Example)

Capacity Market Load Forecast

ANN and Statistical Theory Based Forecasting and Analysis of Power System Variables

Fuzzy Logic based Short-Term Load Forecasting

Advance signals that can be used to foresee demand response days PJM SODRTF - March 9, 2018

Proposed Changes to the PJM Load Forecast Model

FORECASTING FLUCTUATIONS OF ASPHALT CEMENT PRICE INDEX IN GEORGIA

Forecasting of Electric Consumption in a Semiconductor Plant using Time Series Methods

AESO Load Forecast Application for Demand Side Participation. Eligibility Working Group September 26, 2017

Forecasting Unemployment Rates in the UK and EU

Forecasting. Operations Analysis and Improvement Spring

Resource Adequacy Load Forecast A Report to the Resource Adequacy Advisory Committee

Short-Term Load Forecasting Using ARIMA Model For Karnataka State Electrical Load

LOADS, CUSTOMERS AND REVENUE

Fuzzy based Day Ahead Prediction of Electric Load using Mahalanobis Distance

WEATHER DEPENENT ELECTRICITY MARKET FORECASTING WITH NEURAL NETWORKS, WAVELET AND DATA MINING TECHNIQUES. Z.Y. Dong X. Li Z. Xu K. L.

RTO Winter Resource Adequacy Assessment Status Report

Cross-Validation of Elevation Data Interpolation

Solar irradiance forecasting for Chulalongkorn University location using time series models

Forecasting: The First Step in Demand Planning

Time Series Analysis Model for Rainfall Data in Jordan: Case Study for Using Time Series Analysis

Regression-SARIMA modelling of daily peak electricity demand in South Africa

Demand Forecasting. for. Microsoft Dynamics 365 for Operations. User Guide. Release 7.1. April 2018

How Accurate is My Forecast?

Short Term Load Forecasting Using Multi Layer Perceptron

Australian Journal of Basic and Applied Sciences. A Comparative Analysis of Neural Network based Short Term Load Forecast for Seasonal Prediction

peak half-hourly Tasmania

Report on System-Level Estimation of Demand Response Program Impact

LOAD POCKET MODELING. KEY WORDS Load Pocket Modeling, Load Forecasting

RD1 - Page 469 of 578

SHORT TERM LOAD FORECASTING

A Wavelet Based Prediction Method for Time Series

Operations Management

Multi-Area Stochastic Unit Commitment for High Wind Penetration in a Transmission Constrained Network

Nano MgO catalyst for chemical depolymerization of polyethylene terephthalate (PET)

Predicting the Electricity Demand Response via Data-driven Inverse Optimization

Systems Operations. PRAMOD JAIN, Ph.D. Consultant, USAID Power the Future. Astana, September, /6/2018

Foundations - 1. Time-series Analysis, Forecasting. Temporal Information Retrieval

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No MAT-02 October 7, 2014

۲۷۹۶ 0 "' ی " #! ۴۳ و م د ; < : ی"98! ی"#"!

Electric Load Forecasting: An Interval Type-II Fuzzy Inference System Based Approach

SOLVING PROBLEMS BASED ON WINQSB FORECASTING TECHNIQUES

MODELLING ENERGY DEMAND FORECASTING USING NEURAL NETWORKS WITH UNIVARIATE TIME SERIES

peak half-hourly New South Wales

About Nnergix +2, More than 2,5 GW forecasted. Forecasting in 5 countries. 4 predictive technologies. More than power facilities

Univariate versus Multivariate Models for Short-term Electricity Load Forecasting

The SAB Medium Term Sales Forecasting System : From Data to Planning Information. Kenneth Carden SAB : Beer Division Planning

Short-term wind forecasting using artificial neural networks (ANNs)

ABSTRACT I. INTRODUCTION II. FUZZY MODEL SRUCTURE

Comparing the Univariate Modeling Techniques, Box-Jenkins and Artificial Neural Network (ANN) for Measuring of Climate Index

Antti Salonen KPP Le 3: Forecasting KPP227

SCIENCE & TECHNOLOGY

SYSTEM OPERATIONS. Dr. Frank A. Monforte

Chapter-1 Introduction

SARIMA-ELM Hybrid Model for Forecasting Tourist in Nepal

The North American Electric Reliability Corporation hereby submits Informational Filing of the North American Electric Reliability Corporation.

PPU411 Antti Salonen. Forecasting. Forecasting PPU Forecasts are critical inputs to business plans, annual plans, and budgets

CustomWeather Statistical Forecasting (MOS)

peak half-hourly South Australia

Chapter 3. Regression-Based Models for Developing Commercial Demand Characteristics Investigation

Forecasting. Copyright 2015 Pearson Education, Inc.

Demand Forecasting Reporting Period: 19 st Jun th Sep 2017

An approach to make statistical forecasting of products with stationary/seasonal patterns

Explanatory Information Analysis for Day-Ahead Price Forecasting in the Iberian Electricity Market

Occupant Behavior Related to Space Cooling in a High Rise Residential Building Located in a Tropical Region N.F. Mat Hanip 1, S.A. Zaki 1,*, A. Hagish

arxiv: v1 [stat.me] 5 Nov 2008

A Hybrid ARIMA and Neural Network Model to Forecast Particulate. Matter Concentration in Changsha, China

A Dynamic-Trend Exponential Smoothing Model

NATCOR. Forecast Evaluation. Forecasting with ARIMA models. Nikolaos Kourentzes

PREPARED DIRECT TESTIMONY OF GREGORY TEPLOW SOUTHERN CALIFORNIA GAS COMPANY AND SAN DIEGO GAS & ELECTRIC COMPANY

Introduction to Forecasting

An Improved Method of Power System Short Term Load Forecasting Based on Neural Network

Chapter 8 - Forecasting

Transcription:

Al-Hafid: Short term electrical load forecasting using holt-winters method Short term electrical load forecasting using holt-winters method Dr. Majed Saleh Al-Hafid Ghazi Hussein Al-maamary Department of Electrical Engineering-Mosul University / Mosul - Iraq Abstract Load forecasting is a process of predicting the future load demands. It is important for electrical power system planners and demand controllers in ensuring that there would be enough supply of electricity to cope with increasing demands. Thus, accurate load forecasting can lead to an overall reduction of cost, better budget planning, maintenance scheduling and fuel management. Therefore this study aimed to develop new forecasting model for forecasting electricity load demand which will minimize the error of forecasting. This paper presents an attempt to forecast the daily peak demand of electricity by using an appropriate time series model. It is the Seasonal Holt-Winters method. The performance of this method was evaluated by using the forecasting accuracy criteria namely, the Absolute Percentage Error (APE) and the Mean Absolute Percentage Error (MAPE). Based on these criteria the Holt-Winters method emerged as a suitable model for forecasting electricity demand in Iraq. جىقعات األح ال انكهشبائ ة نه ذي انقص ش باسحخذاو طش قة هىنث و حش د. ياجذ صانح انحافظ غاص حس ان ع اس قسى انه ذسة انكهشبائ ة - جايعة ان ىصم / يىصم - عشاق انخالصة: جىقعات األح ال ه ع ه ة جخ األح ال ان ستحقله ة, وهت يه تة بان ستلة ن خططت متاو انقتذسل وان ست طش عهت يحطهلتات األح تال نهحن تذ يت م ه تاي تة اف تة يت انحىن تذ ن ىا لتة انض تادل فت انطهت. ان تىرد انتذق يت انحىقعات األح ال قىد ن جقه تم انكهةتة ومفضتم جخطت ظ نه ضا تة وان حافمتة عهت جذونتة انحإتا م و داسل انىقتىد. نتزن سعث هز انذساسة ن اسحخذاو ىرد جىقع جذ ذ نحىقع انح م انكهشبائ انز س قهم ي األخطاء ف ع ه تة انحىقتع. جتى ف هزا انلحث اسحخذاو ىرد نحىقع مقص ح تم هشبتائ تىي باستحخذاو تىرد سهستهة صي تة ي است, وهتى طش قتة هىنث و حش ان ىس ة. جى جق ى مداء هز انطش قة باسحخذاو حذي يقا س دقة انحىقع وهى سلة انخطن ان طهقة ويحىستظ سلة انخطن ان طهقة. اعح ادا عه هز انق اسات اجضح م هز انطش قة ي اسلة نحىقعات األح ال انكهشبائ ة ف انعشاق. Received: 11 9-2011 Accepted: 5 3-2012

Al-Rafidain Engineering Vol.20 No. 6 December 2012 1. Introduction: Forecasting demand is an essential activity and is one of the most important functions in power system planning and development. It is a prerequisite to power system expansion planning as the electrical installations (Generating station, transmission line, distribution system etc.) are dominated by substantial lead times between decision making and its implementation. This is further complicated because the product i.e., electricity cannot be stored (in large volume) and also, the electricity supply industry is capital intensive. The importance of demand forecasting needs to be emphasized at all level as the consequences of under or over forecasting. The accurate demand forecasting is serious and will affect all stakeholders in the electricity supply industry. If under estimated, the result is serious since plant installation cannot easily be advanced, this will affect the economy, business, loss of time and image. If overestimated, the financial penalty for excess capacity (i.e., overestimated and wasting of resources) [1]. Load forecasts can be divided into three categories: short term (STLF), medium term (MTLF), and long-term forecasts (LTLF). STLF, which is usually from one hour to one week, is concerned with forecast of hourly and daily peak system load, and daily or weekly system energy. It is needed for controlling and scheduling of power system, and also as inputs to Load flow study or contingency analysis. Some of the techniques used for STLF are multiple linear regression, stochastic time series and artificial intelligence based approach. MTLF relates to a time frame from a week to a year and LTLF relates to more than a year. MTLF and LTLF are required for maintenance scheduling, fuel and hydro planning, and generation and transmission expansion planning. The common techniques used for MTLF and LTLF are time trend extrapolation and econometric multiple regression [2, 3]. The electrical load in many countries includes two components, one of them is not affected by weather andthe other is affected by weather (either by increasing or decreasing of temperturedegrees). While in Iraq the component that affected by weather is affected by both increasing and decreasing of temperture degrees. In the past and exactly in the seventieth and eithieth decadesof the previous centurythe summer component was dominant peak load, but fromabout 2002 the winter component appears and became more than summer component, because of the increasing use of water heating, heaters, air conditioner and splits[5]. In 2006 (F. Abd. Razak, M. Shitan, A. H. Hashim, I. Z. Abidin) presented an attempt to forecast the maximum demand of electricity in Malaysia by finding an appropriate time series model. The methods considered in this study include the Naïve method, Exponential smoothing, Holt s linear method, Seasonal Holt-Winters, ARMA and ARAR algorithm. The performance of these different methods was evaluated by using the forecasting accuracy criteria namely, the Mean Absolute Error (MAE), Root Mean Square Error (RMSE) and Mean Absolute Percentage Error (MAPE). Based on these three criteria the pure autoregressive model with an order 2, or AR (2) emerged as the best model for forecasting [3]. In September (2006), the General Management for North Region Electrical Distribution in Iraq presented the long term plan for feeding sources (33, 132) KV for years (2005-2020). The study performed for north conservatisms (Nineveh, Selah Alden, and Kirkuk). They computed the demands for 2005 and then they predicted to other years until 2025.The load have been computed depending on these methods [6]: Consider average of growth 5% for period 1990-2005.

Al-Hafid: Short term electrical load forecasting using holt-winters method Consider the load by summing the loads of the stations that worked now and then they multiplied by suitable diversity factor. Analyzing the daily load curve for the actual supplied energy for conservatisms, that presented by the north control center. But the actual loads at year 2010 exceed what was expected in the study at 2010, and at year2011 the actual loads exceed what was expected in 2015. In this paper, a holt-winters method is used for forecasting the daily peak load data. This method is appropriate to be applied to Iraqi data. 2. The data: The data used in this study is the daily peak load. The loads are recorded at daily intervals. The total observations are 820, started from Thursday, 1-January, 2009 to Thursday, 31-March, 2011. These data are provided by the General Management for North Region Electrical Distribution in Iraq. The data show a periodic repetition, due to weather changes. The time series of demand contains one seasonal pattern. A yearly seasonal cycle is apparent from the similarity of the demand profile from one year to the next year. 3. The forecast accuracy: The criteria chosen to measure the accuracy of the forecasted data in this study are the Absolute Percentage Error (APE) and the Mean Absolute Percentage Error (MAPE), which are given by the following equations: (2) Where Y t and F t are the actual observed values of electrical loads and the predicted values respectively, while n is the number of predicted values [3]. 4. Holt-Winter method: A. Theory: The standard Holt-Winters method was introduced by Winters. The Winter s method is one of several exponential smoothing methods which can analyze seasonal time series directly. The method is based on three smoothing equations one for the level (permanent), one for trend, and one for seasonality (seasonal factor), and it can be either additive or multiplicative seasonality. The multiplicative seasonality is appropriate if the magnitude of the seasonal variation increases with an increase in the mean level of the series. Multiplicative seasonality is considered in this paper since it is more common, and suitable for our data. The Three components (Level, trend, and seasonal) are calculated according to the following equations. The basic equations are[2,3]: (1) Level: α Trend: Seasonal: γ (3) (4) (5)

Al-Rafidain Engineering Vol.20 No. 6 December 2012 Forecast: (6) Where: α, β and γ are smoothing constants. t is the time period. Y t is the actual observed values. s is the length of seasonality. L t is the level component. m t is the trend component. S t is the seasonal component. F t+τ is the forecast for τ periods ahead. The forecasted load is calculated using equation 6. It contains three components (level, trend, and seasonal). These components are calculated using equations 3, 4 and 5; each component has certain smoothing constant (α, β and γ). To find the best time series model which fits the load data (with minimum error) these smoothing constants are found, which are called optimal smoothing constants. This time series model is ready now to forecast future loads. The flow chart that describes this method is illustrated in figure(1).the development of a forecasting system using Winter s method requires initial values of the parameters L 0, m 0 and S t (0)for t=1,2,...s. Historical information, if available, can be used to provide some or all of the initial values. The estimate of the trend component can be found by: Where: d is the number of seasons which are used to determine the initial values and x r, r = 1, 2 d, denote the average of the observations during the rth season. The permanent component at the start of the first period would be estimated by: Seasonal factors are computed for each time period t= 1, 2.d*s. that is: (7) (8) [ ] t =1, 2 d*s. (9) Where: x i is the average for a season corresponding to the t index, and j is the position of the period t within the season (for example, if 1 t s, then i =1, and if s+1 t 2s, then i =2; and when t=1 and t=s+1, then j = 1, etc.). Equation (7) will produce d estimates of the seasonal factor for each period. These should be averaged to produce a single estimate of the seasonal factor for each period within the season. This is accomplished by: t = 1, 2...s. (10) Finally, the seasonal factors should be normalized so that they add to s. This produces the initial estimates of the seasonal factors as [4]: t = 1, 2.s. (11)

Al-Hafid: Short term electrical load forecasting using holt-winters method Input data Input the values of s and d Compute the initial value of the trend X component d X d Compute the initial value of the level component, X Compute the initial values of the seasonal component h Y X i [ s /2 j] d d k h s k F 1 = (m 0 +L 0 )*S 1 Set the values of α, β and γ equal to 0.001 t=1 t=t+1 Update the parameters α Y α β - - -β - γ Y γ q q No If t Total No. of Observations Yes R n If MAPE Minimum Yes Save MAPE, α, β and γ No Increase α, β and γ by 0.001 α, β and γ=1 No Yes Print Y t, F t, MAPRE, α, β and END Fig. (1): The flow chart of the Holtwinter method.

Al-Rafidain Engineering Vol.20 No. 6 December 2012 B. Implementation: The holt-winter method is applied on the daily peak load data that are recorded in Mosul city by the General Management for North Region Electrical Distribution to forecast it. The forecasting method is programmed by the Mat lab program in PC. The data are divided two parts, the first part contains 813observations which are used to find the initial values of the parameters L 0, m 0 and S t (0) for t=1,2,... s. Where s=365 and d=2, s*d must be more than half the data used to find the initial values of the parameters, and then the equations (3-6) are implemented to forecast one step ahead at τ=1. And the second part of the data is used to test the forecast by forecasting to seven steps ahead and comparing the actual values with that forecasted, where τ=2, 3, 4, 5, 6, 7, 8. 5. Results and discussion: The first results are the values of the smoothing constants and MAPE for one step ahead forecasting are illustrated in Table1and the actual and forecasted load curves are illustrated in figure (2). The MAPE is 3.94 %. The second results are load forecasted for seven steps ahead. Table (2) gives the actual and forecasted load values with APE for each step. The actual and forecasted loads are plotted in figure3. The MAPE for this case is 4.49 %. There were some differences between the actual load values and the forecasted load values because the actual data observations are implemented directly without preprocess. Original data usually contain abnormal values (noise), so they need to be processed before using them in predicting electrical load. Wavelet or statistical methods are usually introduced for such preprocessing of data. The processed data will give better accuracy. To extend the forecasted period more past data are needed. Table 1. Smoothing constants and MAPE. α β γ MAPE% 0.24 1.0e-5 1.0e-5 3.948 Table 2.The actual and forecasted values and APE for seven steps ahead. Days (τ) Observations APE% Actual Forecast 2 605 655.905 8.414 3 613 602.588 1.699 4 620 595.559 3.942 5 671 674.475 0.8 6 630 687.966 9.201 7 612 640.739 4.696 8 606 623.939 2.960 6. Conclusion: This paper presents an attempt to forecast the daily peak demand of electricity by using an appropriate time series model. It is a Holt-Winter model. The results of the MAPE indicated for one step ahead is 3.94%, and for seven steps ahead is 4.49%. Therefore, Holt- 02

Al-Hafid: Short term electrical load forecasting using holt-winters method Winter multiplicative seasonal model can be used to forecast loads even for unstable or weak electrical systems. Fig. (2): The actual and predicted loads curves for one step ahead forecasting at τ = 1. Fig. (3): The actual and predicted loads curves for forecasting seven steps ahead. 05

Al-Rafidain Engineering Vol.20 No. 6 December 2012 ACKNOWLEDGMENT The researchers express their deep gratitude and thanks to the administration and the engineers of the General Management for North Region Electrical Distribution for their valuable help and cooperation in this study. References [1] Z. Ismail, A.Yahya and K.A. Mahpol, "Forecasting Peak Load Electricity Demand Using Statistics and Rule Based Approach", American Journal of Applied Sciences 6 (8): 1618-1625, 2009. [2] James W. Taylor Short-Term Electricity Demand Forecasting Using Double Seasonal Exponential Smoothing University of Oxford, Journal of Operational Research Society, 2003, Vol. 54, pp. 799-805. [3] Fadhilah Abd. Razak, Mahendran Shitan, Amir.H. Hashim, Izham. Z. Abidin Forecasting the Maximum Demand of Electricity in Malaysia International Conference on Energy and Environment 2006 (ICEE 2006). [4] Douglas C. Montgomery and Lynwood A. Johnson "Forecasting and Time Series Analysis", McGraw-Hill, Inc, 1976. (Book) [5] M. S. Al-Hafid, A. S. Al-Fahadi and Y. A. Mahmood "Separation of The components of Electrical Load for the Iraqi Distribution System" Fifth Libyan Arab International Conference On Electrical and electronic Engineering,Vol.2,October23 26,2010. [6] The General Management for North Region Electrical Distribution, The long term plan for feeding sources (33, 132) KV for years (2005-2020) September (2006). 00